Description
Production and project planning includes advanced planning solutions for finite capacity production scheduling, equipment scheduling, project scheduling and materials management, with Gantt charts and KPI reporting.
With Production and Project Planning solutions from ORTEC you can handle the following challenges:
- Schedule machines, equipment and tools
- Schedule of human resources like operators, equipment drivers, or other personnel
- Optimize the utilization of your scarse resources
- Deal with complex product and project structures
- Control workload
- Meet precedence relations between operations
- Control calendars and unavailability of resources
- Deal with competences and capabilities
- Synchronize various processes
- Optimize utilization
- Deal with alternative routings
- Control material availability and material usage
- Minimize (sequence dependant) set-up times and change-over times
- Produce just-in-time
- Reduce stock levels